Canfor announces production cuts at Southern US facilities

Canfor announces production cuts at Southern US facilities

Posted on September 9, 2024   |  

Canfor is cutting production at its southern US operations because of weak lumber markets.

One shift at the Darlington, South Carolina facility will be stopped indefinitely.

Canfor will reduce working hours at its Estill, South Carolina, and Moultrie, Georgia, locations.

Other southern US sites will also see production cuts to match market demand.

These changes will lower Canfor’s lumber production by about 215 million board feet annually.



Help us by filling out this quick price survey

A PHP Error was encountered

Severity: Warning

Message: Trying to access array offset on value of type null

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: _error_handler

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

A PHP Error was encountered

Severity: 8192

Message: trim(): Passing null to parameter #1 ($string) of type string is deprecated

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: trim

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

https://www.timber.exchange/global-timber-pricing-survey?u=a6abeb5b68e3b8f580a2cd89404d571df8da219aa1d9585d51f054b2408a1bddf17c16cc0807d712a5e223223515fba58366ef5ed6c322886eac5e5ad1c09df39h8rgKu9cRaONTT6UgL%2FKvu4HFJVsxKehDccVhn6ZmU%3D" class="survey-banner-link" id="bannerLink" target="_blank"> Take Survey