BC Housing floats tender to analyse use of mass timber for affordable housing
Posted on April 26, 2021 |
- The bidding process closes April 28, 2021
- BC Housing believes this is a good way to cut greenhouse gas emissions
- The tender which was opened on March 11th is to perform a study on the economics of using mass timber for multi-unit projects between seven and 12 storeys high.
- Mass timber is a renewable resource with a lower carbon footprint compared to traditional concrete construction methods.