A PHP Error was encountered

Severity: Warning

Message: Undefined array key "seo_image"

Filename: outsidelogin/news_details_for_mdh.php

Line Number: 63

Backtrace:

File: /var/www/html/application/views/pages/outsidelogin/news_details_for_mdh.php
Line: 63
Function: _error_handler

File: /var/www/html/application/controllers/News.php
Line: 862
Function: view

File: /var/www/html/application/controllers/News.php
Line: 22
Function: timberNewsWithoutLogin

File: /var/www/html/index.php
Line: 332
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: Undefined array key "seo_image"

Filename: outsidelogin/news_details_for_mdh.php

Line Number: 65

Backtrace:

File: /var/www/html/application/views/pages/outsidelogin/news_details_for_mdh.php
Line: 65
Function: _error_handler

File: /var/www/html/application/controllers/News.php
Line: 862
Function: view

File: /var/www/html/application/controllers/News.php
Line: 22
Function: timberNewsWithoutLogin

File: /var/www/html/index.php
Line: 332
Function: require_once

Egypt to deliver 3 gigawatts of electricity to Europe

At Centersource Technologies AB we are committed to the highest standards of ethical research and data integrity, guided by the ESOMAR Code of Conduct. Our data is sourced from a limited, anonymous market survey conducted with trusted and established industry participants. The insights derived from this survey reflect aggregated finalized prices as well as observed prices reported within the participants respective markets, with a focus on the highest prices recorded during the first two weeks of each month. These insights are provided for informational purposes only and are intended to indicate market trends rather than serve as comprehensive or fully representative market data.

In adherence to ESOMAR's principles, we ensure that all data collection and analysis are conducted with transparency, respect for confidentiality, and strict compliance with ethical guidelines:

  • Data Sourcing and Methodology:
    We exclusively use data from government, customs, or government-affiliated websites to maintain reliability and public integrity. In addition, we engage directly with industry experts to gather real-time, firsthand information. Each data point is collected, verified, and aggregated following established ethical standards, ensuring that our research processes meet the rigor recommended by ESOMAR.
  • Transparency and Accuracy:
    All data are published promptly as they become available from the source, ensuring that our insights remain current and reflective of on-ground market dynamics. We actively seek and incorporate regular feedback from industry experts, which allows us to make real-time adjustments and continuously improve the accuracy and reliability of our data.
  • Ethical Data Usage and Third-Party Material:
    Our adherence to the ESOMAR Code of Conduct underscores our commitment to ethical research practices. We maintain strict controls over data sharing and usage; copying or distributing our data is prohibited under our company policy. Furthermore, all necessary agreements are in place for any third-party material used, ensuring full compliance with copyright laws and industry best practices.
  • Limitation of Liability:
    While we strive to provide high-quality, timely market insights, the data is derived from a limited sample and should be interpreted within that context. We are not liable for any damages arising from the use of this data, as it is provided solely for informational purposes and as a directional indicator of market trends.

By integrating ESOMAR's ethical guidelines into our research methodology, we ensure that our practices are transparent, respectful of data confidentiality, and aligned with internationally recognized standards. This commitment not only reinforces the credibility of our insights but also builds trust with our stakeholders and industry partners.

Egypt to deliver 3 gigawatts of electricity via an 853-mile-long undersea cable to European households

Egypt to deliver 3 gigawatts of electricity via an 853-mile-long undersea cable to European households

Posted on October 17, 2022   |  

  • The undersea power cable, GREGY, will bring 3,000 MW of renewable energy from Egypt to Attica, Greece, using the production of solar power from the Sahara Desert.
  • The cable will be operational for 8 years of which one-third of the cable’s supply will power Greek heavier industry,
  • Another third will be exported through a shared network to Bulgaria and Italy and the final third will be for the production of green hydrogen.

 

 

 

 

 

 

Image: Good News Network