West Fraser reduced operations to 3-day week at BC sawmills due to transportation challenges

Posted on March 7, 2022   |  

  • West Fraser is temporarily moving from a 5 to 3-day operating schedule for its B.C. lumber mills to manage the inventories and minimize the impact on 740 employees.
  • The transportation crisis in Western Canada started flooding in the Lower Mainland last fall, has left the industry with significant inventory challenges.



Help us by filling out this quick price survey

A PHP Error was encountered

Severity: Warning

Message: Trying to access array offset on value of type null

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: _error_handler

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

A PHP Error was encountered

Severity: 8192

Message: trim(): Passing null to parameter #1 ($string) of type string is deprecated

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: trim

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

https://www.timber.exchange/global-timber-pricing-survey?u=73c78991faeba2a2a2e100c96b33ab0fd6ec4b1ba020fb46aed44c8e52ecf18ded6300408015aec6d2a3efc1f0988f37ecec5e139d137fee6bfb04d990f1c138ewOeXZeBeSDdn5skEJ5R41Iwi%2BLuUCiR6yl%2B3UU9C2o%3D" class="survey-banner-link" id="bannerLink" target="_blank"> Take Survey