Shanghai to build a new 11.6m TEU terminal at the Yangshan facility

Posted on September 26, 2022   |  

  • Shanghai International Port Group (SIPG) will establish a huge 11.6m TEU new terminal in the Yangshan facility.
  • The construction of the $7.8bn project will begin this year and will be finished by 2030, adding 5,500 m of extra quayside to Shanghai’s far-flung container facilities.



Help us by filling out this quick price survey

A PHP Error was encountered

Severity: Warning

Message: Trying to access array offset on value of type null

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: _error_handler

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

A PHP Error was encountered

Severity: 8192

Message: trim(): Passing null to parameter #1 ($string) of type string is deprecated

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: trim

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

https://www.timber.exchange/global-timber-pricing-survey?u=6535ed2bd1c0c2189c6d01327f2d53028f3af438ec3aebddbccd008b394a2e7be8873512c1503b0b695f8f3a0259771b0c4cea4021987b81dc7b38fb10b8b134XxDLcNVpYweJN%2FdLzXyvRn%2FQj64BHA4sRWu5WegEgNc%3D" class="survey-banner-link" id="bannerLink" target="_blank"> Take Survey