China-Europe rail freight network faced congestion from 2 broken cranes on the Kazakhstan border

China-Europe rail freight network faced congestion from 2 broken cranes on the Kazakhstan border

Posted on October 25, 2022   |  

  • In Khorgos, 2 out of 3 cranes operating at the Altynkol transshipment terminal broke down, producing widespread delays and schedule changes.
  • As a result, two-to-three train batches are unable to load on time every day and the transport schedules for November will be suspended.
  • China Railway cut slots for the 2nd half of October to avoid more delays but for now, China Railway was holding 23 trains at Alashankou, 33 at Khorgos, 13 at Erenhot, 16 at Manzhouli, and 1 at Suifenhe, which can lead to massive congestion.



Help us by filling out this quick price survey

A PHP Error was encountered

Severity: Warning

Message: Trying to access array offset on value of type null

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: _error_handler

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

A PHP Error was encountered

Severity: 8192

Message: trim(): Passing null to parameter #1 ($string) of type string is deprecated

Filename: layouts/market_data_layout.php

Line Number: 124

Backtrace:

File: /var/www/html/application/views/layouts/market_data_layout.php
Line: 124
Function: trim

File: /var/www/html/application/hooks/secDisplay.php
Line: 50
Function: view

File: /var/www/html/index.php
Line: 332
Function: require_once

https://www.timber.exchange/global-timber-pricing-survey?u=d703fa8372ec2efb16c56cd51fc56981d672f924124a79867f0fdf853e483efa19068d3b7bb4693949131221ca1c7a16b7fb277e77f345e1179f43746747b4d5KCxHD52YBt5lv4nN%2FPQ9U7YBoFZENAqil4MpYQV23e0%3D" class="survey-banner-link" id="bannerLink" target="_blank"> Take Survey