Hutchison Ports and Terminal Investment Limited Sàrl (TiL) to build a 7 million TEU container terminal at the Port of Rotterdam
Posted on September 5, 2022 |
- The box terminal will be built in Europahaven, where the north side of the Hutchison Ports ECT Delta terminal and Hutchison Ports Delta II (the former APMT-R site) are located, both locations are part of the new container terminal and will promote MSC’s initiatives for further growth.
- The Port of Rotterdam Authority will redevelop the quay walls and the entire terminal will be developed and launched in phases which will begin the first phase of operation in 2027.
- The new terminal will consist of 5 deep-sea berths with a total length of 2.6 kilometers and will have a capacity of 6 to 7 million TEU.